Total Bathroom Remodel
Back to Our Work
John's Island, Charleston, SCKitchen & Bath

Total Bathroom Remodel

A full gut renovation from builder-grade to polished

This bathroom was functional but dated. Builder-grade fixtures, worn tile flooring, and a tired look throughout. Allforce Services gutted the space down to the studs, rebuilt it with proper waterproofing, and delivered a clean, modern bathroom with a new tile surround, updated vanity, fresh paint, and modern lighting.

Full Gut Job

Stripped to the studs and subfloor for a true start-to-finish rebuild

Waterproofed

Cement board, moisture-resistant drywall, and waterproofing compound for lasting protection

Modern Finish

New tile surround, updated vanity, modern fixtures, and fresh paint throughout

The Challenge

What We Were Working With

The bathroom had all the hallmarks of a builder-grade space that hadn't been touched in years. A basic tub/shower combo with a fabric curtain, a small cherry-toned vanity with a round drop-in sink, worn ceramic tile flooring, and dated fixtures made the room feel tired. The homeowners wanted a fresh, modern bathroom that felt clean and inviting, but with the existing wear and outdated finishes, a surface-level refresh wasn't going to cut it.

Dated bathroom with worn tile flooring cherry vanity and basic tub shower combo

The original bathroom. Worn tile, a small cherry vanity with a round sink, and a basic tub/shower combo with a fabric curtain.

Another angle of the dated bathroom showing vanity mirror and builder-grade fixtures

Builder-grade fixtures and a tired feel throughout, ready for a complete overhaul.

The Process

How We Got It Done

Allforce Services started with a full gut. The old tile flooring was torn out down to the subfloor, the vanity and toilet were removed, and the plumbing supply lines were left exposed for reconfiguration. The tub surround walls were stripped all the way to the studs, revealing the framing and allowing for structural and plumbing updates. New cement board and moisture-resistant drywall were installed around the tub area, with waterproofing compound carefully applied to protect against future water damage. The tub was wrapped in protective plastic through the drywall and finishing stages. New tile flooring was laid, a white tile surround was installed around the tub, and the space was painted in a soft gray-green tone. A new elongated toilet, an updated cherry vanity with a granite-look countertop and brushed nickel faucet, a framed mirror, and a two-light vanity fixture completed the rebuild.

1
Old tile flooring partially removed exposing plywood subfloor

Demolition begins. Tearing out the old tile flooring to expose the subfloor underneath.

2
Vanity and toilet removed with exposed plumbing supply lines

Vanity and toilet pulled out. Plumbing supply lines exposed and ready for reconfiguration.

3
Tub surround stripped to wall studs with exposed framing and plumbing

Stripped to the studs. The tub surround walls fully opened up for structural and plumbing work.

4
New cement board and waterproofing compound applied around tub area with tub wrapped in plastic

Cement board and waterproofing compound applied around the tub. The tub wrapped in plastic during finishing work.

5
New tile surround installed around tub with new toilet and vanity being set in place

Coming together. New white tile surround installed, toilet set, and the updated vanity in place.

The Results

The Finished Product

The finished bathroom is a complete transformation from its builder-grade origins. A clean white tile surround encloses the tub area with a modern shower curtain rod. The new elongated toilet replaces the old round-front model. The updated vanity features a rich cherry finish with a granite-look countertop, brushed nickel faucet, framed mirror, and a two-light vanity fixture above. Fresh paint in a soft gray-green ties the room together. Modern, inviting, and built to last with proper waterproofing behind every wall.

Completed bathroom with white tile surround updated cherry vanity framed mirror and modern lighting

The finished bathroom. Clean tile surround, updated vanity with granite-look countertop, framed mirror, modern lighting, and soft gray-green paint.

The Transformation

Before & After

Before total bathroom remodel in John's Island, Charleston, SC
Before
After total bathroom remodel in John's Island, Charleston, SC
After